Featured case study
Security that kept pace with construction.
Active guarding, controlled access and supervised overnight patrols helped protect valuable assets as a large construction site moved through changing phases.
Construction security in Leigh for temporary works, refurbishments and longer builds. Our officers provide a visible presence and agreed access control, with cover planned around the people and activity near your site.
Your World, Protected.®
We provide construction security in Leigh for organisations protecting building works, plant and materials. An assignment can last for a short project stage or continue throughout a wider programme. We agree the hours, post and responsibilities so your team knows what each period of cover includes.
Officers can manage authorised arrivals, maintain a fixed visible presence or patrol the areas specified in the brief. We consider how those duties work together, especially where work takes place beside premises that remain open. A workable staffing plan allows the officer to carry out the role you need.
Before cover starts, we confirm the site information, induction, equipment and management contacts. Supervision and reporting continue during the assignment, including handovers for concerns that remain unresolved. If the temporary work area moves, the instructions can be reviewed with your project team.
Tell us what you need using the enquiry form, or continue reading to learn more about StrongGuard Security UK.
Complete the form and a member of our team will be in touch.
Short assignments still need clear preparation. We focus on a visible, informed officer, a defined work boundary and a confirmed handover when the requirement ends or changes.
People may ask why a space is closed, where a business entrance has moved or whether they can pass through the works. We obtain the information your team has approved for those conversations. An officer can give a consistent explanation and refer a complaint without inventing a completion date or permission.
We brief officers on the audience around the site as well as the work itself. The post may need a continuous visible presence rather than a patrol away from the public-facing area. That distinction is agreed at the planning stage, together with uniform, protective equipment and the procedure for requesting support.
A short programme can still involve several entrances, equipment left overnight and a boundary that moves between stages. We identify the spaces under your control and what should remain available to other users. The security plan needs the current layout, rather than only the outline of the finished project.
HSE guidance on protecting the public explains why access and physical boundaries need attention. Officers follow the agreed procedure when someone approaches a restricted space or a barrier appears damaged. Any patrol is limited to the safe areas included in the assignment; changes are referred for updated instructions.
For temporary cover, we confirm the first covered shift, the expected final shift and who will receive the site afterwards. If the works overrun or finish early, your contact can raise that with our management team. The actual coverage should be confirmed rather than inferred from the original programme dates.
Reports help track access queries, observations and action across a short assignment. We agree which matters need a call and which belong in the handover. At the end, outstanding concerns and the return of any keys or records are passed to the nominated person.
Our wider highways work has included an initial seven days of out of hours guarding. Although the manned assignment was brief, we still completed the client’s supplier approval requirements, prepared RAMS and assignment instructions, and provided the specified protective equipment and an on-site occurrence log.
A short requirement still needs time for preparation. When discussing temporary cover, we confirm the first and final covered shifts, the information needed before deployment and who will receive the records. The duration of the assignment does not remove the need for a clear brief.
People may ask why a space is closed, where a business entrance has moved or whether they can pass through the works. We obtain the information your team has approved for those conversations. An officer can give a consistent explanation and refer a complaint without inventing a completion date or permission.
We brief officers on the audience around the site as well as the work itself. The post may need a continuous visible presence rather than a patrol away from the public-facing area. That distinction is agreed at the planning stage, together with uniform, protective equipment and the procedure for requesting support.
A short programme can still involve several entrances, equipment left overnight and a boundary that moves between stages. We identify the spaces under your control and what should remain available to other users. The security plan needs the current layout, rather than only the outline of the finished project.
HSE guidance on protecting the public explains why access and physical boundaries need attention. Officers follow the agreed procedure when someone approaches a restricted space or a barrier appears damaged. Any patrol is limited to the safe areas included in the assignment; changes are referred for updated instructions.
For temporary cover, we confirm the first covered shift, the expected final shift and who will receive the site afterwards. If the works overrun or finish early, your contact can raise that with our management team. The actual coverage should be confirmed rather than inferred from the original programme dates.
Reports help track access queries, observations and action across a short assignment. We agree which matters need a call and which belong in the handover. At the end, outstanding concerns and the return of any keys or records are passed to the nominated person.
Our wider highways work has included an initial seven days of out of hours guarding. Although the manned assignment was brief, we still completed the client’s supplier approval requirements, prepared RAMS and assignment instructions, and provided the specified protective equipment and an on-site occurrence log.
A short requirement still needs time for preparation. When discussing temporary cover, we confirm the first and final covered shifts, the information needed before deployment and who will receive the records. The duration of the assignment does not remove the need for a clear brief.

Improvement works, refurbishment, new housing and infrastructure can all create a temporary security requirement. The six project settings below show the range we support. We consider the working area and surrounding activity before agreeing whether a visible post, patrols or a combination of duties suits the project.
Residential
Refurbishment
Commercial
Demolition
Industrial
InfrastructureAcross Wigan, police recorded 31,089 offences, excluding fraud. This was 1.6% lower than the preceding year.
5.1% higher than the preceding year
3.5% lower than the preceding year
1.8% higher than the preceding year
19.4% higher than the preceding year
Source Office for National Statistics, using Home Office police-recorded crime data. View source tables (XLSX).
Coverage Wigan Community Safety Partnership area. These are offences recorded by police, not a measure of all crime or the probability of an incident at an individual business.
Non-residential burglary is the source’s published category and is not limited to commercial premises. Vehicle offences and criminal damage and arson include incidents affecting individuals as well as organisations. Changes in reporting and recording can affect the figures. Percentage comparisons are omitted where the source suppresses them, the earlier total is below 50, or a comparable figure is unavailable.
Combined totals add the separate categories displayed. Combined percentage changes are calculated from the summed current and preceding-year counts, not by averaging category percentages. Contributions describe changes in recorded offence numbers, not the causes of crime. A combined comparison is omitted if any category lacks a valid comparison.
Figures and commentary update together when a new official release passes validation. Source notes are assessed by area. A local data-quality issue holds only the affected areas. Earlier figures retain their original period where the source warning permits their use; otherwise local figures are withheld. A general methodology or structural change may hold the whole release. Contains public sector information licensed under the Open Government Licence v3.0.
We cover Leigh town centre, including the areas around Bradshawgate, Market Street and Civic Square. The council’s Leigh Regeneration Project includes public spaces, shopfronts and market improvements. Those different settings make it useful to identify any trading premises, public route or parking area that must continue operating beside your works.
Our coverage also includes Westleigh, Pennington and Bedford, with enquiries welcomed from neighbouring communities such as Lowton and Golborne. We establish the location of the actual security post and any separate compound when preparing the assignment. The map shows the wider Leigh and Wigan borough service area.
An established operational presence helps us assess urgent cover requests, with arrangements confirmed against the project and available officers. We also have local job centre relationships that support recruitment when required. Local geography can help an officer find and understand the setting, while the induction defines the duties on that site.
The boundary shown identifies our operational coverage across Leigh and Wigan borough.
Featured case study
Active guarding, controlled access and supervised overnight patrols helped protect valuable assets as a large construction site moved through changing phases.
Share your site location and the cover you need, or call our team to discuss the service.
Questions for temporary works beside trading premises and spaces used by the public.
Yes, we can discuss a defined period such as enabling works, an overnight work window or a gap between stages. Confirm the covered hours, post and handover contact. Short duration does not remove the need for the appropriate site briefing, safe working arrangements and any supplier approval required.
Identify the customer entrance, delivery route and the boundary of the work area. We can then brief the officer on which people may use each space and what information to give them. If a security task would take the officer away from a post requiring continuous presence, staffing needs to be reviewed.
They can pass on the information your project team has approved and direct further questions to the nominated contact. We need an update when that information changes. Officers should not estimate completion dates or make commitments about reopening a route on behalf of the contractor.
Confirm the final shift, the time responsibility passes to the next person or arrangement and who accepts the handover. Any change to those details needs to reach our management team. The handover should include outstanding observations and any keys or records the receiving contact needs.
Selected feedback from clients across our service portfolio.
I work for a Major Main Contractor in the Construction Industry and would like to take the opportunity of recommending StrongGuard Security to any potential Client. StrongGuard are a well run and extremely professional organisation who constantly strive to improve the services they offer to their Clients.
Tony was very dedicated and went above and beyond with all our needs, his staff were well trained and never let us down.
Very well presented, on time and managed the job expected of them.
We use cookies to enhance your browsing experience, serve personalised ads or content, and analyse our traffic. By clicking "Accept", you consent to our use of cookies.
Leave your details and a member of our team will call you back. Prefer to talk now? Call 0800 612 0749.
Together, the four categories shown accounted for 5,269 recorded offences in Wigan, a rise of 1.4% on the preceding year. Recorded crime overall moved in the opposite direction, falling by 1.6%.
Increases in three of the categories shown outweighed reductions elsewhere in this group. Criminal damage and arson remained the largest category shown. These figures include incidents affecting the wider community as well as businesses.